Project ID: 2024-ENE-03

AKK Gas Pipeline Project

Last Updated on: 10-Nov-2024

Under Implementation
Stage 3 / 4

In Progress

  1. check

    Under Conceptualization

    Done
  2. check

    Under Development

    Done
  3. engineering
    Current Stage

    Under Implementation

    Active
  4. flag

    Completed

    Upcoming

Project Overview

The Ajaokuta–Kaduna–Kano (AKK) Gas Pipeline is a flagship 614-kilometre natural gas transportation backbone designed to link Nigeria's gas-rich southern basins to industrial and power-generation hubs across the north. Once commissioned, the line is expected to carry up to 2.2 billion standard cubic feet of gas per day, anchoring new gas-fired power plants, fertiliser production, and industrial clusters along the corridor.

Structured as a public-private partnership under the Ministry of Petroleum Resources, the project opens opportunities for investors across construction, compression infrastructure, metering, and long-term gas off-take. It sits at the centre of Nigeria's gas-to-power strategy and the broader national decade of gas agenda.

conversion_path

614 km

Pipeline length

gas_meter

2.2 bscf/d

Gas capacity

map

3 States

Kogi · Kaduna · Kano

payments

$2.80 bn

Total investment

Sector

Oil & Gas / Power

State

Kano

Project Start Date

15-Mar-2020

Project Completion Date

31-Dec-2025

Promoter/Sponsor Type

Public-Private Partnership

Project Status

Under Construction

Line Ministry

Ministry of Petroleum Resources

Total Project Cost: USD 2.80 bn

info More Details

lock Members Only

Target IRR

17.4%

Payback

6.2 yrs

Min. Ticket

USD 5M

Lock-up

5 yrs

/ to unlock the full investor data room.

lock_open Investor Data Room

Extended project brief, media, and documents — available to signed-in members of the OSIP investor network.

verified Access Granted

Extended Project Brief

The Ajaokuta–Kaduna–Kano (AKK) Gas Pipeline is a 614 km strategic backbone designed to monetise stranded gas in Nigeria's southern fields and deliver it to under-served industrial and power-generation hubs across the north. Total capital outlay is USD 2.6 Bn under a public-private structure, with sovereign cover from the Federal Ministry of Power and offtake commitments anchored by NIPCO and existing IPPs. The deal carries a 17.4% target IRR, a 6.2-year payback, a USD 5M minimum investor ticket, and a 5-year lock-up.